18 Bank Road IWI case study hero
Back to Case Studies
ECO4EPC G → C+68 SAP PointsSWIP IWI System

18 Bank Road — ECO4 Whole-House Retrofit

Semi Detached · Wellington, Telford, Shropshire · TF1 1SA

EPC Improvement

G

SAP 7

Before

+68
SAP points
C

SAP 75

After

Annual savings£293/year

Project Details

Property Type

Semi Detached House

Construction

Solid Wall (1900–1929) · 101m²

Location

Wellington, Telford, Shropshire TF1 1SA

Funding Stream

ECO4 (Energy Company Obligation)

Client Type

Private Rented Sector

Retrofit Coordinator

Vrindara Chopra

Key Stats

G→C

EPC Uplift

+68

SAP Points

101m²

Floor Area

5

Measures

Scope of Works

  • Internal Wall Insulation (SWIP & Knauf system)
  • Loft Insulation top-up to 300mm
  • First Time Central Heating (FTCH)
  • Worcester Greenstar Gas Boiler
  • Secure Controls Heating System
  • Decentralised Mechanical Extract Ventilation (DMEV)
  • TrustMark Lodgement Completed

Compliance

StandardPAS 2030 / PAS 2035
C2 InspectionSWIP
C3 InspectionTecnika
TrustMarkLodged ✓

"Much warmer."

— Jamie, Telford

ECO4 retrofit for your properties?

EmberSol delivers full ECO4 whole-house retrofits under PAS 2035, from survey to TrustMark lodgement.

Get a Quote

Project Overview

EmberSol delivered a full ECO4 whole-house retrofit at 18 Bank Road, Wellington — a solid-wall semi-detached house built circa 1900–1929 in Telford, Shropshire. The property was in EPC band G (SAP 7) at referral, with no central heating system, severely degraded loft insulation, and uninsulated solid brick walls presenting significant heat loss.

The primary fabric measure was Internal Wall Insulation (IWI) using the SWIP system with Knauf mineral wool batts. As a pre-war solid brick construction, the property has no cavity and cannot receive Cavity Wall Insulation — making IWI the only compliant wall insulation route under ECO4. The SWIP system was installed across all external-facing walls, with the Intello intelligent vapour control layer providing adaptive moisture management to prevent interstitial condensation in the solid wall construction.

Loft insulation was upgraded to 300mm Knauf mineral wool, replacing the heavily degraded original insulation. The loft hatch was insulated and draught-proofed as part of the works. First Time Central Heating (FTCH) was installed — a Worcester Greenstar gas boiler with full radiator system and Secure Controls, replacing the existing electric heating system.

A Decentralised Mechanical Extract Ventilation (DMEV) system was installed to maintain healthy indoor air quality following the improvement in airtightness from the IWI and loft insulation measures. The combined works took the property from EPC G (SAP 7) to EPC C (SAP 75) — a 68-point SAP uplift. All works were completed under ECO4 with full PAS 2035 compliance, with C2 inspection by SWIP and C3 inspection by Tecnika.

Site Photography

Photos show the full installation sequence from pre-works loft survey through IWI stages to completed rooms and boiler installation. Click any image to enlarge.

Technical Specification

IWI SystemSWIP with Knauf Mineral Wool + Intello VCL
Loft InsulationKnauf 300mm top-up, full coverage
BoilerWorcester Greenstar (FTCH)
ControlsSecure Controls heating system
VentilationDMEV — continuous background extract
Pre-Works EPCG (SAP 7)
Post-Works EPCC (SAP 75)
SAP Uplift+68 points
Floor Area101m²
ConstructionSolid Wall, 1900–1929
C2 InspectionSWIP
C3 InspectionTecnika