Top Floor Flat · Ketley, Telford, Shropshire · TF1 5EZ
Before
SAP 18
After
SAP 83
Property Type
Top Floor Flat
Construction
Cavity Wall (1976–1982)
Location
Ketley, Telford TF1 5EZ
Client
Private Tenant — Dean, Telford
Funding
ECO4
Floor Area
53 m²
Solar PV
3.6kW — 8 × Black Monocrystalline Panels
Electric Storage Heating
ESH — Elnur Gabarron High-Retention Heaters
Loft Insulation
Knauf Loft Roll 44 — 300mm Total Depth
Ventilation
DMEV — Demand-Controlled Mechanical Extract
Much warmer.
— Dean, Telford
34a Woodside Road is a top-floor flat in Ketley, Telford, built between 1976 and 1982 with cavity wall construction. Prior to works, the property had no insulation, no renewable energy, and relied entirely on direct-acting electric heating — resulting in an EPC G rating (SAP 18) and annual energy costs of £2,792.
Under the ECO4 scheme, EmberSol installed a 3.6kW Solar PV system (8 black monocrystalline panels with Fox inverter), Knauf Loft Roll 44 insulation to 300mm, Elnur Gabarron high-retention electric storage heaters, and a DMEV ventilation system. The works were completed in November 2025 and TrustMark lodgement was completed.
The post-works EPC assessment confirmed a rating of B (SAP 83) — a 65-point SAP uplift from G to B, reducing estimated annual energy costs from £2,792 to £1,175 and delivering estimated annual savings of £1,617. Retrofit Coordinator: Vrindara Chopra. C3 inspection by Tecnika.
| Property | 34a Woodside Road, Ketley, Telford TF1 5EZ |
| Property Type | Top Floor Flat, Cavity Wall (1976–1982) |
| Floor Area | 53 m² |
| Funding | ECO4 |
| Pre-Works EPC | G — SAP 18 |
| Post-Works EPC | B — SAP 83 |
| SAP Uplift | +65 points |
| Annual Cost Before | £2,792/yr |
| Annual Cost After | £1,175/yr |
| Annual Saving | £1,617/yr |
| Solar PV System | 3.6kW — 8 × Black Monocrystalline Panels |
| Inverter | Fox Solar Inverter with DC & AC Isolators |
| Loft Insulation | Knauf Loft Roll 44 — 300mm Total Depth |
| Heating | Elnur Gabarron ESH — High-Retention Electric Storage Heaters |
| Ventilation | DMEV — Demand-Controlled Mechanical Extract Ventilation |
| Standards | MCS, PAS 2030, PAS 2035, TrustMark Lodged |
| Retrofit Coordinator | Vrindara Chopra |
| C3 Inspection | Tecnika |
| Works Completed | November 2025 |