ECO4EPC F → B+49 SAP Points2.5kW Solar PV

Flat 2, 111 Aldridge Road — ECO4 Retrofit & Solar PV

Ground Floor Flat · Great Barr, Birmingham, West Midlands · B42 2ET

EPC Improvement

F

SAP 37

Before

+49
SAP points
B

SAP 86

After

Annual savings£141/year

Solar PV System

System Size2.5kW
Panels5 × 500W monocrystalline
InverterSolis S5 Series
CertificationMCS · G98/G99
MountingFlat roof, SE facing

Project Details

Property Type

Ground Floor Flat

Construction

Solid Wall (pre-1900) · 54m²

Location

Great Barr, Birmingham, West Midlands B42 2ET

Funding Stream

ECO4 (Energy Company Obligation)

Client Type

Private Rented Sector

Retrofit Coordinator

Vrindara Chopra

Key Stats

F→B

EPC Uplift

+49

SAP Points

2.5kW

Solar PV

4

Measures

Scope of Works

  • Solar PV — 2.5kW (5 × 500W), Solis inverter, MCS certified
  • Electric Storage Heaters (ESH) — high-retention replacement
  • Loft Insulation top-up to 300mm (Knauf)
  • Decentralised Mechanical Extract Ventilation (DMEV)
  • TrustMark Lodgement Completed

Compliance

StandardPAS 2030 / MCS
Solar Cert.MCS Certified
Grid ComplianceG98/G99
TrustMarkLodged ✓

"Much warmer."

— Uwais, Birmingham

Solar PV or ECO4 retrofit?

EmberSol delivers MCS-certified Solar PV and full ECO4 retrofits under PAS 2035. Get in touch to discuss your project.

Get a Quote

Project Overview

EmberSol delivered a multi-measure ECO4 retrofit at Flat 2, 111 Aldridge Road — a ground floor flat in Great Barr, Birmingham, built before 1900 with solid wall construction. The property was in EPC band F (SAP 37) at referral, with degraded loft insulation, old inefficient electric storage heaters, and no renewable energy generation.

The standout measure on this project was the installation of a 2.5kW Solar PV system — 5 monocrystalline panels mounted on the flat roof section of the property, facing south-east to maximise annual yield. The system uses a Solis S5 Series inverter and is MCS certified and G98/G99 compliant for grid connection. For a flat with electric heating, Solar PV provides a direct route to reducing electricity bills by offsetting daytime consumption.

The existing electric storage heaters were replaced with new high-retention electric storage heaters (ESH) — significantly more efficient models with digital programmable controllers. The new ESH units are designed to work in conjunction with the Solar PV system, using cheap overnight electricity for storage and solar-generated electricity during the day to reduce running costs.

Loft insulation was upgraded to 300mm Knauf mineral wool, replacing the degraded existing insulation. A Decentralised Mechanical Extract Ventilation (DMEV) system was installed to maintain healthy indoor air quality. The combined measures took the property from EPC F (SAP 37) to EPC B (SAP 86) — a 49-point SAP uplift, achieving EPC B status which is a significant outcome for a pre-1900 solid wall flat. All works were delivered under ECO4 with full PAS 2030 compliance and TrustMark lodgement.

Site Photography

Photos show the pre-works loft survey, solar PV installation on the flat roof, electric storage heater replacement, and Solis inverter commissioning. Click any image to enlarge.

Technical Specification

Solar PV2.5kW — 5 × 500W monocrystalline panels
InverterSolis S5 Series, MCS certified
Grid ComplianceG98/G99
MountingFlat roof, SE facing, ballasted
Storage HeatersHigh-retention ESH with digital controls
Loft InsulationKnauf 300mm top-up
VentilationDMEV — continuous background extract
Pre-Works EPCF (SAP 37)
Post-Works EPCB (SAP 86)
SAP Uplift+49 points
Floor Area54m²
TrustMarkLodged ✓