Ground Floor Flat · Great Barr, Birmingham, West Midlands · B42 2ET
SAP 37
Before
SAP 86
After
Property Type
Ground Floor Flat
Construction
Solid Wall (pre-1900) · 54m²
Location
Great Barr, Birmingham, West Midlands B42 2ET
Funding Stream
ECO4 (Energy Company Obligation)
Client Type
Private Rented Sector
Retrofit Coordinator
Vrindara Chopra
F→B
EPC Uplift
+49
SAP Points
2.5kW
Solar PV
4
Measures
"Much warmer."
— Uwais, Birmingham
EmberSol delivers MCS-certified Solar PV and full ECO4 retrofits under PAS 2035. Get in touch to discuss your project.
Get a QuoteEmberSol delivered a multi-measure ECO4 retrofit at Flat 2, 111 Aldridge Road — a ground floor flat in Great Barr, Birmingham, built before 1900 with solid wall construction. The property was in EPC band F (SAP 37) at referral, with degraded loft insulation, old inefficient electric storage heaters, and no renewable energy generation.
The standout measure on this project was the installation of a 2.5kW Solar PV system — 5 monocrystalline panels mounted on the flat roof section of the property, facing south-east to maximise annual yield. The system uses a Solis S5 Series inverter and is MCS certified and G98/G99 compliant for grid connection. For a flat with electric heating, Solar PV provides a direct route to reducing electricity bills by offsetting daytime consumption.
The existing electric storage heaters were replaced with new high-retention electric storage heaters (ESH) — significantly more efficient models with digital programmable controllers. The new ESH units are designed to work in conjunction with the Solar PV system, using cheap overnight electricity for storage and solar-generated electricity during the day to reduce running costs.
Loft insulation was upgraded to 300mm Knauf mineral wool, replacing the degraded existing insulation. A Decentralised Mechanical Extract Ventilation (DMEV) system was installed to maintain healthy indoor air quality. The combined measures took the property from EPC F (SAP 37) to EPC B (SAP 86) — a 49-point SAP uplift, achieving EPC B status which is a significant outcome for a pre-1900 solid wall flat. All works were delivered under ECO4 with full PAS 2030 compliance and TrustMark lodgement.
Photos show the pre-works loft survey, solar PV installation on the flat roof, electric storage heater replacement, and Solis inverter commissioning. Click any image to enlarge.